Multitech BL-Series Manual de usuario Pagina 51

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 60
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 50
49 C-DOT DSS MAX-XL
Chapter 5.
MDF - Installation
5.1. GENERAL
The MDF installation, on the RBM side, is similar to the MDF installation for C-
DOT-SBM RAX in respect of subscriber and trunk cabling. However the additional
cabling is required for RSU installation on the RBM side and on the parent
exchange side in respect of 16 PCMs between parent exchange and RBM.
5.2. DIGITAL TRUNK CABLE TERMINATION ON RBM TO MDF (FOR RSU
PCMS)
a) 16 PCMs i.e. L1 to L8, L17 to L24 are terminated on 4 Nos of 2/8 LSA
modules.
b) If 4 pair cable is used from TSU frame to MDF, terminations on MDF are
done as shown in figure 5.1 (a). If 8 pair cable is used from TSU frame to
DDF, terminations on MDF are done as shown in figure 5.1 (b).
c) Cables marked RNUU, RNVV coming from copy – 0 of TSU are terminated
on first 2/8 module as shown in figure. Cables marked RNXX, RNYY coming
from Copy – 0 of TSU are terminated on second 2/8 module as shown in
figure. For cables coming from copy – 1 of TSU termination is done on third &
fourth modules. Termination is done in the same way, as done for copy – 0
cables.
d) For digital trunk cable preparation using 4 pair shielded cable & placement
details, refer to sections 3.2.2.1 & 3.2.2.2. For digital trunk cable preparation
using 8 pair shielded cable & placement details, refer to section 3.2.2.3.
e) The grounding leads coming out from digital cables at the ends near MDF
can be crimped to a ring terminal and terminated on one of the screw & nut
holding same backmount frame as shown in Fig. 3.2 c.
Vista de pagina 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 59 60

Comentarios a estos manuales

Sin comentarios