Chapter 5.
5.3. DIGITAL TRUNK CABLE TERMINATION ON CM TO DDF (FOR RSU
PCMS)
While laying the cables on CM side, details given in table 5-1 may be seen
depending on CM-L or CM-XL.
a) 16 PCMs ie. L1 to L8, L17 to L24 are terminated on 4 Nos of 2/8 LSA
modules as shown in Figure 5.2.
b) For each RBM, 4 Nos of 4 pair shielded cables are used per BTU frame.
c) 4 Nos. of 4 pair cables from BTU0 are terminated on first and second 2/8 LSA
Modules. Cables marked MNUU, MNVV are terminated on first 2/8 LSA
Module and Cables marked MNXX, MNYY are terminated on second 2/8
LSA. Similarly 4 Nos of cables from BTU1 are terminated on third & fourth
2/8 LSA modules. All terminations are done as shown in Figure 5.2.
d) For cable preparation & placement details refer to section 3.3.1 & 3.4.
e) The grounding leads coming out from digital cables near DDF can be crimped
to ring terminal & terminated to one of screw & nut of backmount frame.
5.4. INTER CONNECTIONS
The connections between RBM & CM through respective DDFs are shown in Figure
5.3.
50 C-DOT DSS MAX-XL
Comentarios a estos manuales